Merseyrail – Sandhills Kitchen and Welfare Refurbishment

Merseyrail - Sandhills Kitchen and Welfare Refurbishment


PROJECT

Sandhills Kitchen and Welfare Refurbishment


CLIENT

Merseyrail


SECTOR

Rail


THE BRIEF

Design and Installation of the Kitchen and Welfare Unit at Sandhills Station

THE SOLUTION

The scheme was managed and delivered by SIS Projects.  The works were carried out over a 4 week period and completed on time.

Summary of works:

Design Pack, Temporary Facilities, R&D Asbestos Survey

Strip out all existing services.

Replacement of Kitchen units and High end appliances.

Flooring, Ceiling, Window Manifestations,

M&E including new electrical supply and local distribution board, including fire dampers.

Powder coat paint existing steel window frames to new colour.

Full Furniture package fit out.

 

 

ASDA Petrol Stations Pay PODS

ASDA Petrol Station Pay PODS


PROJECT

ASDA Petrol Station Pay PODS


CLIENT

ASDA


SECTOR

Retail


THE BRIEF

Supply and Installation of Drive/Walk to Pay Window

THE SOLUTION

Internal counter work station specially designed to incorporate under counter unit to enable specific positioning of computer equipment

Communication system with induction loop

Roller Blind

Window Frames and Glazing with anti bandit double glazed units

 

Llanelli Station

Llanelli STATION


PROJECT

Llanelli Station NSIP Refurbishment


CLIENT

Transport for Wales


SECTOR

Rail


THE BRIEF

Contract Value  £416K

THE SOLUTION

SIS Projects were employed by Transport for Wales as a main contractor to provide the following solutions:

Full refurbishment of gents, ladies and disabled toilets. This included new tiling, floor finishes, toilet cubicles, ceiling, automatic entrance doors, decoration and associated M&E/ building works.

Refurbishment of 2 waiting rooms which included new floors, ceilings, seating, decoration, automatic doors and all associated M & E works/building works

Full refurbishment of Heart of Wales office which included new floors, ceilings, decoration, automatic doors and all associated M & E works/building works

The provision of a New Fire Alarm

The provision of data and electrical services

 

Bridgend Station

BRIDGEND STATION


PROJECT

Bridgend Station NSIP Refurbishment Scheme


CLIENT

Transport for Wales


SECTOR

Rail


THE BRIEF

Working for Marshdale Construction our part of the fit out was to the value £225,000

THE SOLUTION

SIS Projects were contracted to supply and Install the following Solutions:

New 3 Position Ticket Office

New Information Counter

New Curtain Walling and Auto Doors

New Canopy over Entrance

New Automatic Doors to ladies, gents and disabled toilets

High Level Glazed Windows over Concourse

North Maghull Station

NORTH MAGHULL STATION


PROJECT

North Maghull Station


CLIENT

Merseyrail


SECTOR

Rail


THE BRIEF

Contract Value £140,000

THE SOLUTION

SIS Projects were contracted to provide the following solutions:

Full internal fit out of the Station building including Floors, Ceilings, Stud Walls and Decoration.

We Installed a new One Bay Ticket Counter a Rear Staff Break Out Area a Mess Room and Kitchen.

New Internal and External Steel Security Doors and Lift Room Doors were supplied and installed.